DCT

Infrastructure

infrastructureDCT Gdansk will meet the needs of increasing container transportation by investment in its infrastructure and equipment. DCT Gdansk has successfully completed its first phase of development and is currently providing customers with modern facilities:

  • 44 hectares (108 acres) of total area
  • 650m total quay length of which 265m has 13.5m depth and 385m has 16.5m depth (“Baltimax” draft alongside)
  • 40m wide Ro-Ro ramp
  • 32 main container stacks over 18,000 TEU capacity
  • Empty container area with 5,000 container capacity
  • 336 reefer plugs
  • 5 hectares of heavy-duty paving to facilitate the storage of Ro-Ro traffic and non containerised cargo
  • CFS warehouse  (7,200m²) with truck ramp. Space available to be double the size of the warehouse
  • Rail siding: 2×1,000m tracks, railway handover point. Additional two tracks to be constructed and rail crane installed
  • Truck park for up to 100 truck/trailer combinations
  • Gate lanes manned 24/7 by security staff, CCTV monitored, RF tag identification and radiological sensors
  • 756m² fully equipped engineering workshop and stores
  • Administration building with 3,000m² of office space and amenities for staff, Customs and the Border Guard
  • Office space for rent

DCT